Page 8 - NWI Presentation May 2012

Basic HTML Version

8
Diabase Peninsula Uranium Project
Recent select drill results
Diabase 2010-’11 Drill Results (U values >1ppm considered significant)
Hole
Result
ND10-01
14.69m of 25.29ppm U from 378-392.69m, including
71 ppm U over 2.61m immediately at the Unconformity
ND10-02
Averaged 4.26m grading10.8ppm U below the
Unconformity
ND10-03
18m of 18.06ppm U straddling the Unconformity from
379.5-397.5m
ND10-04
19.25m of 11.99ppm U at the Unconformity. The final
sample of the interval graded 24.8 ppm U
ND10 05
1 5m grading 14 9ppm U below the Unconformity
-
.
.
ND11-02
4.5m grading between 10.7 and 92.0ppm straddling
the unconformity from 396.95m to 401.45m
ND11-03
19.5m ranging from 4.46-47.8ppm straddling the
unconformity at 428.75m
ND11-04
Uranium values range from 6.48-72.1ppm immediately
below the unconformity
TSX:NWI
ND11-05
11.1 ppm below the conformity